2 | A | B | C | D | E | F | H | I | K | L | M | N | O | P | R | S | U | V | W
  • Network equipment-building system (NEBS) - Design guidelines applied to telecommunications equipment.

  • Nominal Cooling Capacity - The total cooling capacity of air conditioning equipment, includes both latent and sensible capacities. Due to humidity control in data centers, the latent capacity should be deducted from nominal capacity to determine useful capacity.